From: route@monster.com
Sent: Thursday, April 07, 2016 11:54 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Keith James 409-392-4076 keith.james123@hotmail.com Seeking position as Lead Scheduler or Project
Controls Manager. Work History 8/14-Present = Brunel @
BHP Billiton in Houston, TX · Lead
Well Delivery Scheduler on Eagle Ford Shale Project · Maintained
the entire schedule for the Eagle Ford Shale from Planning through
completions in Actenum DSO 5 software. · Ran
weekly meetings to update status and inter-resource timing. · Work
with Interventions, Completions, and Well Delivery Planners to determine the
best sequence for not only the individual resources, but also the whole area
of wells. · Scheduled
for up to 18 Drilling rigs, 9 Frac Crews, and 4 Coil Tube units. · Wrote
and distributed custom DSO reports to part time users of DSO. These relieved
the burden from the schedulers of having to run weekly reports and allowed
the end users to run them as needed. ·
Instrumental in designing the latest version of DSO. I provided the
parameters that it had to meet to be usable. 1/12-8/14 = Tepco @
Marathon Oil in Houston, TX · Well
Readiness Scheduler on Eagle Ford Shale Project · Helped
develop the schedule to determine fastest time possible to have a well ready
to drill. · Built
and ran weekly reports to update status · Worked
with Subsurface manager to determine proper well sequence in rig lines · Worked
with over 20 different drilling rigs. · Ran
custom reports out of Acumen Fuse for upper management. 6/11 to 12/11 = Tepco @ Bayer
Material Sciences in Baytown, TX · Lead
TA Scheduler. · Built
and maintained TA schedule including Capital Projects
and Maintenance schedules · Resource
loaded schedule for manpower planning. · Scheduled
5 Units with critical path in each Unit · Software
used includes Primavera 8.0 and Excel 6/10 to 6/11 = Tepco
@ Flint Hills Resources in Port Arthur, TX · Project
Controls Lead. · Built
and maintained multiple schedules including Capital Projects and Turnaround
schedules. · Collected
and reported on progress in all stages of schedules, including engineering
and construction. · Focal
point for all cost issues associated with capital projects and TA’s. · Responsible
for informing Project Managers of potential cost over runs and helping them
mitigate the issue before it happens. · Analyzed
cost reports to populate cost curves and reports. · Site
Lead for implementation of the FHR planning and estimate tool · Software
used includes Primavera 6.7 and Excel. 11/07 to 6/10 = TTMC @
Shell Chemical in Deer Park, TX. · Lead
Scheduler. · Built
and maintained multiple schedules from planning phase through completion of
project · Site
focal point for Primavera. · Assisted
in writing the Schedule Premise Document that Shell Deer Park will conduct
all TA scheduling activities going forward · Developed
the interface by which Primavera is able to talk to the cost tool that is
used at Shell Deer Park · Resource
loaded all schedules, focused on critical path activities, and helped train
leadership in what ways the schedule can help them manage field construction/
maintenance activities · Integrated
all Capital projects work that executed during our TA window. · Provided
earned value reports to gauge progress during the execution window. These
ranged from simple S-curves to float reports for specific critical path
items, to earned value by specific company, equipment type, or funding
source. · Frequently
called upon to speak to the TA planning department about issues surrounding
Primavera or Scheduling in general. · Worked
with all the contractors to insure that their work was correct in the
schedule and they could support the scheduled dates. · Worked
closely with the cost department to make sure that scheduled hours in
Primavera aligned with the projected spend hours for contractors. · Software
used includes Primavera 4.1, 5.0, 6.0 and 6.2 and Excel 12/06 to 11/07 = IMS @ Verasun
Energy in Welcome, MN · Project
Scheduler · Built
and maintained high level construction schedule for Ethanol
Plant Construction · Included
timelines for engineering and physical on site construction. · Built
and updated a remediation schedule for failed subsoil stabilization. · Used
Primavera 5.0 and Excel 1/06 to 11/06 = TTMC @
Exxon-Mobil, Valero, and Shell · Planner/Scheduler · Built
Job plans for added work and input them into the schedule · Updated
the schedule for daily progress · Used
Primavera 3.1, 4.1, 4.5, and 5.0 2/99-1/06 Starcon INT. @
Various Locations. · Started
as a Boilermaker/Pipe fitter and worked my way up to Lead Area
Foreman/General Foreman. · Was
the site Field Supervisor at Marathon Refinery in St. Paul Park, MN when
Starcon took over the Maintenance contract · Directed
work for all disciplines, piping, boilermakers, insulation, and
scaffolding. Software
Proficiencies · Primavera
4.5, 5.0, 6.0, 6.2, 6.7, 8.0 (Completed Advanced level P6 training) · Microsoft
Office Suite · Familiar
with Microsoft Projects ·
Internet
Explorer ·
Actenum
DSO Version 5 Residential
History · 12/07-
Present 15231
Harlin Baytown, TX 77523 · 12/06-11/07 108
Torrey Pines Dr. Mankato, MN 56001 · 1/06-12/06 8087
Jergen Ave South Cottage Grove, MN 55016 · 8/05-1/06 2837
Cornelia Trail Woodbury, MN 55125 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|